The Livestock Protocol addresses GHG emission reductions associated with installing a manure biogas control system for livestock operations, such as dairy cattle and swine farms.
Current Protocol Version(s) Available for Project Submittal | Adoption Date | Notes and Supporting Documents |
---|---|---|
U.S. Livestock Protocol Version 4.0 | January 23, 2013 | Errata and Clarifications to U.S. Livestock Protocol Version 4.0 (July 19, 2023)
U.S. Livestock Protocol V4.0 Summary |
Protocol Supporting Documents
The documents and tools below are made available to account holders upon request. The tools are designed to help livestock project developers organize their project data and facilitate verification. Use of the tools is optional; however, it may be useful in identifying important aspects of the Livestock Protocol and streamlining verification. Whether the project developer decides to use the Reserve’s Calculation Tool or their own, the tool must be submitted to the Reserve during verification.
Reserve Livestock Calculation Tools | ||
Protocol Version | Relevant Document/Tool | Description |
---|---|---|
U.S. Livestock Protocol Version 3.0 | Reserve Livestock Calculation Tool Version 3.0l (July 2022) | The Reserve has developed the Livestock Calculation Tool to assist with the quantification of projects using the U.S. Livestock Protocol. If you are developing a livestock project and would like to receive a copy of this tool, please send an e-mail to: [email protected]. In the body of the e-mail message, please include the following information:
The use of this tool is optional, but only the most current version should be used for project quantification. The current versions utilize IPCC’s 5th Assessment Report Global Warming Potential Values. |
U.S. Livestock Protocol Version 4.0 | Reserve Livestock Calculation Tool Version 4.0h (July 2022) |
Project Registration Documents | |||
Document | Description | Required Phase | Privilege |
---|---|---|---|
Livestock Project Submittal Form | A proposal to undertake a livestock gas capture and destruction project. | Project Submittal | Public |
Livestock Baseline Diagram | Diagrammatic representation of the waste management system existing on the project site prior to project implementation. | Project Submittal | Public |
Project System Diagram | A project diagram is required for non-sequestration projects. See the example livestock diagram for recommended format and content. | Verification | Private |
Livestock Sample Monitoring Report | This report is required when a project elects to take a zero-credit reporting period (see section 3.4.7 of the Reserve Program Manual) or when choosing verification period Option 3 (see section 8 of the Livestock Project Protocol). | Verification | Private |
Reserve Livestock Calculation Tool | The Reserve has developed the Livestock Calculation Tool to assist with the quantification of projects using the U.S. Livestock Protocol. Project developers may use the Reserve Livestock Calculation tool but are not required to do so. Whichever calculation tool that is utilized by the project developer must be submitted to the verification body and the Reserve during verification. | Verification | Private |
Livestock Project Design Document | The purpose of this document is to assist livestock project developers in identifying high areas of risk, highlight important aspects of the U.S. Livestock Protocol, and facilitate verification. To request a copy, please send an email to [email protected] and indicate your Reserve Project ID number and dates of the current reporting period. | Verification | Private |
Protocol Development & Previous Versions
Use the links below to access information about the original protocol development process and view previous versions of the Livestock Protocol. Public comments, staff responses to public comments, workgroup participants, and other supporting documents can also be found here.
Click a version of the protocol below to access more information:
- Version 4.0 (January 23, 2013)
- Version 3.0 (September 29, 2010)
- Version 2.2 (November 3, 2009)
- Version 2.1 (August 20, 2008)
- Version 2.0 (August 12, 2008)
- Version 1.0 (June 19, 2007)
Please contact the Reserve with questions or comments.